GNPD Site Establishment Construction (MM General Requirements - Mobilization)
Installation of gondola for shutdown works.
Provision of assistance during the inspection of the PCCP Sea Water Cooling Inlet to be undertaken during the Unit 1 Performance Test Outage and in conjunction with the GNPD Construction Team.
GNPD 03 00 1 AFI 00234-Mill C Gearbox vibration sensor to be installed in Mill input Shaft Bearing Assembly
LV Switchgear & controls missing terminal covers
All pipe supports submerged in ponding waters to be rectified, All rusted supports to be painted
10HLA70CF101 - Transmitter -No Display in the Field
Nonconformance on installation of insulation and cladding at baghouse for unit1
All pipe supports submerged in ponding waters to be rectified, All rusted supports to be painted
Cable reel winding speed and the ship unloader travelling speed not synchronized leading to stress on cable drum and supports
Elevation 0.0m. Pipe support to be fix properly
Unit 1 Main Power Building 460V Distribution Room. Fire Door. Lock mechanism is broken. Final Inspection of door required.
APH B inlet flue gas damper 1 actuator supply manifold loosed, temporarily secured with electrical tape (10HNA02AA002A)
Elevation +46.50 Sealing of gap between the cladding & lower wall
Inst. on additional CCTV on the stacker boom
Support was welded on dtructure (this structure needs to be lifted during maintenance / lifting of equipment)
MPD room elevation 6.9m
10HJL75AA101 Re-orientation of MOV indication not visible during operation
Fabrication and Installation of Piping for Domnick Hunter PCO2 Filter
Shinetsu
Fabrication and Installation of Stainless Steel Filter Housing
Steelcorp, Balayan, Batangas
Replacement of 1,000 mm² Power Cable for Nitrogen Plant
Emerson
Installation of Instrument Air Line for Testing Stations
Metrobank
Supply and Install CCTV system for 29 Mindanao Branches: Cagayan De Oro, Iligan , Bukidnon, Davao and Cotabato.
Interphil Laboratories Inc.
Preventive Maintenance of LBS
Installation of Power Meter
Hearty Beverage Options, Inc.
Supply of ABB current sensor
James Hardie Phils., Inc.
Motor Preventive Maintenance (64 units)
Hankyu Hanshin Logistic Phils. Inc.
Electical Power Panel Upgrade
Topi
Panel Load Verification
SMT
Meeting Room Renovation
Supply & Installation of Wooden Swing Door
Supply & Installation of 2.5Hp
Supply & Installation of Wooden Sliding Door
Modification of employee entrance gate
Schafer
Installation of ASRS
MEI
Overwrapping Machine Relocation and wirings
Construction of Compressor Room and relocation of Compressor from PSBI
Supply and installation of step up transformer
PMFTC
BTG 225 square meter Gazebo
Fish Pond Pathway Improvement
Workshop Door Relocation
Harnessing of Cable and Pneumatics Line
KONE CRANES
Installation of Overhead Crane
TECH-QUIPPED CORPORATION
Installation of Hydrojet in Calaca Power Plant
Soot Blower Installation
Installation of Additional BCW Pump for Unit 1
Variation Order for BCW
Supply of manpower, supervision, tools, equipment and materials/consumables for the installation of new hydrojet and accessories, relocation of Old hydrojet unit and modification of water supply line @ Boiler unit 1
Kalayaan Hydro Power Plant, Charles Philip
1.6 KM 2/0 AWG 4-run Cable Pulling & Termination
2 KM 5KV Cable Pulling & Termination
Transitions Optical Philippines, Inc.
Electrical Installation
San Miguel Packaging Specialists, Inc., Gen. Trias, Cavite
Power Distribution System Annual Maintenance Program